Controlled density fill (basically weak concrete) is poured around the piles and used as a base for the form work for the pile caps. You can see the connection between the piling and the pile cap in the bottom of the form.
The form gets filled with concrete, the surrounding area filled with CDF, and we are ready for the next phase of our project...culvert removal and channel construction!
Wow! Such an amazing and helpful post this is. I really really love it. It's so good and so awesome. I am just amazed. I hope that you continue to do your work like this in the future also pile driving
ReplyDelete